by Earl | Jun 15, 2019 | Building the Quompound, Loft House, Tutorials
Here’s a quick rundown of how we did the final bracing at the top of the arched header, at the big window wall. If you are new to the blog, this is the third in a series on the framing of our house; you can read part 1 on interior framing here and part 2 on the...
by Earl | May 2, 2019 | Building the Quompound, Loft House
It’s one thing to draw something up, even something that takes a lot of thought, and hand it over to a General Contractor to build; it’s quite another to design something complicated and intricate and have to figure out every single part of it because...
by Earl | Apr 15, 2019 | Building the Quompound, Loft House
The Loft House is no longer a big empty shell! Our framing crew has been on the scene, and really transformed things. Here’s how it looked before they started. Bare bones ICF walls with the Quonset roof overhead. The Epic Massive Beam The first thing was to...
by Earl | Aug 15, 2017 | Building the Quompound, Headquarters Hut, Workshop Hut
After a little more of a break in the action than we had planned on, having hurt my back on the last day of our previous trip, Eric and I finally made it back to the property on Monday the 7th of August, and worked for a week. We found everything pretty much as we had...